Donner Summit Historic Tunnel: This 1,659-foot tunnel was the first railroad line to traverse the Sierra Nevada Range. It was primarily built by Chinese workers and was hand drilled and blasted over 15 months. The tunnel was completed in August 1867, and the first train passed through it on June 18th, 1868. The last train passed through in 1993 when the route was changed to a new location.
top of page
bottom of page
佳作分享,謝謝!Tunnel的塗鴉壯觀,很是增色!讚
張張佳作,謝謝分享🙏
第一張若有光線斜射進畫面,一定更棒!
Monitor Pass的秋景: